Please enable JavaScript in your browser to complete this form.
All construction in Burgundy Oaks Subdivision is subject to approval of an Architectural Control Committee (ACC). A copy of this emailed form should be attached to all requests. Once the Approval Request and plans have been submitted, it may take up to 30 days to evaluate the request.
Homeowner
Address
Contractor
For new structures or changes to the existing structure, insure that the exterior material is clearly identified.
Has the Contractor been given a copy of the Covenant containing the ACC Requirements?
Does the Contractor have an estimated completion date?

Note: During construction the lot owner must insure that any dirt or debris from said lot onto streets  and/or affecting adjoining lots is promptly removed. The lot owner is responsible for any damages occurring during construction activities to streets or adjoining properties. Do not permit collection of mud from site onto streets or to silt into lakes. All concrete washout and residues must be disposed of on the building site or at an approved location. Washout shall not be placed on adjoining lots, roads or future road locations. Do not allow or dispose of concrete washout, paints, chemicals, etc., into gutters or inlet drains—this goes directly to the lakes. Please advise all subcontractors. Building sites should be kept as neat and clean as possible during construction. Contractor and/or lot owner is responsible for all trash disposal and notification of these conditions to all subcontractors.

Download document option also available…

ARCHITECTURAL CONTROL INFORMATION FACT SHEET AND CHECKLIST

“Thank you for keeping our neighborhood beautiful. Have a blessed day.”

Burgundy Oaks HOA