All construction in Burgundy Oaks Subdivision is subject to approval of an Architectural Control Committee (ACC). The plans for such construction must be submitted and approved in advance of any construction. The lot owner is required to submit one set of all plans and specifications, which will be retained by the ACC. Each lot is required to utilize the ACC approved front yard light and mailbox; this is provided at cost ($600) paid to the Developer at closing. ACC approval must be obtained prior to any changes or additions to the plot plan, architectural design, outbuilding, fencing, pools, decks, gazebos, etc.
Below is a list of minimum requirements for submitted plans. Plans not meeting these minimums will be returned without being submitted to the ACC.
MINIMUM REQUIREMENTS FOR PLANS
- Submittal of ACC Approval Request form. (click here)
- Plot or site plan—this plan should show:
- Actual lot size to scale with dimensions.
- Actual house shape to scale with dimensions to lot lines.
- Location and layout of all drives, walks and yard lights.
- Easements and setbacks from the subdivision plat.
- On site drainage plan.
- Elevations—Submit professionally drawn elevations showing front (street) view of home and all side views. As nearly as possible, the elevations should show the “public” views of the structure as it would appear when complete.
- Floor plan—Drawn to scale showing all rooms and fixtures; the primary criteria for this plan is that it meets the required minimum square footage of 2,000 square feet and accurately shows the layout of the house.
PLEASE KEEP IN MIND THE FOLLOWING REQUIREMENTS:
Contractor
Minimum sq. ft.
Drainage
Roof pitch/Shingles
Exterior finishes
Garage
Sidewalks
Yard Light
Landscaping
Licensed Builders must oversee all construction
2,000 Square Feet Heated Living area.
Builders must meet city code for storm water pollution plans (not reviewed by ACC)
8/12 or greater with architectural style shingle (no three-tab shingles). For roof sections where an 8/12 is not feasible, a lower pitch approval may be requested.
Masonry or comparable material, i.e., stucco, brick, etc.
Enclosed two cars: rear, swing or side entry
3 feet wide brush finish sidewalk along all street frontages. 3 feet from curb; variances permitted for circumstances of trees or other encumbrances with prior approval by AAC
Pole location us 22 feet from back of curb. Height is 7.5 feet from ground to top of pole (not including globe)
The front yard must be sodded upon completion of construction.
Note: During construction the lot owner must insure that any dirt or debris from said lot onto streets and/or affecting adjoining lots is promptly removed. The lot owner is responsible for any damages occurring during construction activities to streets or adjoining properties. Do not permit collection of mud from site onto streets or to silt into lakes. All concrete washout and residues must be disposed of on the building site or at an approved location. Washout shall not be placed on adjoining lots, roads or future road locations. Do not allow or dispose of concrete washout, paints, chemicals, etc., into gutters or inlet drains—this goes directly to the lakes. Please advise all subcontractors. Building sites should be kept as neat and clean as possible during construction. Contractor and/or lot owner is responsible for all trash disposal and notification of these conditions to all subcontractors.
Submit an Architectural Request form online… ACC Approval Request form. (click here)
Download document option also available… ARCHITECTURAL CONTROL INFORMATION FACT SHEET AND CHECKLIST
“Thank you for keeping our neighborhood beautiful. Have a blessed day.”
Burgundy Oaks HOA